Post by account_disabled on Aug 29, 2023 8:44:05 GMT
The facade of the subway station has a special pattern that reduces solar energy, while geometric perforations reveal the station in its cultural context. "The overall structure is similar to the patterns created by desert winds in sand dunes, where multiple frequencies and repetitions create complex natural formations," ZHA said in its project description.
The KAFD metro station consists of elements that are highly correlated with repetition, symmetry and scale to simplify technical challenges without sacrificing spatial quality or design ambitions.
Harry Ibbs, Head of BIM and Workflow at Zaha Hadid Qatar Mobile Number List Architects, previously explained how ZHA uses BIM modeling as part of the design process in an exclusive interview with the World Architectural Society.
"The architecture, engineering and construction (AEC) industry is not yet fully digitized and lags far behind the aerospace, manufacturing, and consumer goods industries," BBS pointed out.
It was estimated that over 15,000 jobs would be created in Saudi Arabia during the first five years of the project's implementation period and over the next ten years, and this figure was easily exceeded during the project.Italy's Concrewall or European Union's "Snell house" system uses single and double EPS type foam pellets blown into a steam environment and then compressed by a high-pressure pump.
In this way, the semi-finished products assembled at the factory for the purpose of the 5-layer double wall plate for the outer wall, the 3-layer single plate for the inner wall, and the grooved pavement plate of the reinforced concrete beam pouring form will be assembled at the construction site by connecting them with reinforcement according to the drawing.
After that, it is sprayed with pre-prepared shotcrete concrete mixture of appropriate composition to a certain thickness and strengthened under normal conditions. This system is an architectural HYBRID technology system that combines prefabricated and cast-in-place prefabricated semi-finished products on site.
The KAFD metro station consists of elements that are highly correlated with repetition, symmetry and scale to simplify technical challenges without sacrificing spatial quality or design ambitions.
Harry Ibbs, Head of BIM and Workflow at Zaha Hadid Qatar Mobile Number List Architects, previously explained how ZHA uses BIM modeling as part of the design process in an exclusive interview with the World Architectural Society.
"The architecture, engineering and construction (AEC) industry is not yet fully digitized and lags far behind the aerospace, manufacturing, and consumer goods industries," BBS pointed out.
It was estimated that over 15,000 jobs would be created in Saudi Arabia during the first five years of the project's implementation period and over the next ten years, and this figure was easily exceeded during the project.Italy's Concrewall or European Union's "Snell house" system uses single and double EPS type foam pellets blown into a steam environment and then compressed by a high-pressure pump.
In this way, the semi-finished products assembled at the factory for the purpose of the 5-layer double wall plate for the outer wall, the 3-layer single plate for the inner wall, and the grooved pavement plate of the reinforced concrete beam pouring form will be assembled at the construction site by connecting them with reinforcement according to the drawing.
After that, it is sprayed with pre-prepared shotcrete concrete mixture of appropriate composition to a certain thickness and strengthened under normal conditions. This system is an architectural HYBRID technology system that combines prefabricated and cast-in-place prefabricated semi-finished products on site.